
Dated: 01/09/2022
Section: 15
Issue raised:
1. Just after the allotments past station a Henley in Arden the path is very overgrown.
2. Post where we turned left needs a Heart of England Way sign.
3. Next post which turns right over the footbridge needs Heart of England Way sign.
4. There is a tree branch over the footbridge which is damaging it.
5. First stile bottom plank needs replacing.
6. Stile which leads on to main road A4189 needs attention and a sign is needed on the post.
7. Stile by Well Cottage boards need replacing.
8. Next stile boards need replacing.
9. Wobbly post on stile.
10. Stile across fields rotten bottom.
11. Wobbly stile next opening in right hand corner of field.
12. Wonky post on lane label on it to report any comments on paths paths@warwickshire.gov.uk
13. Fallen signpost in field.
Location: Henley in Arden to Greenhill Farm
Grid Ref: